World Trade Center

Owner: Legacy Partners Realty Fund

Architect: Gensler

General Contractor: Johnston & Associates

The World Trade Center renovation was constructed with Black Silica Carbide bands and Bianco Nero Lithocrete® field panels. The entire area is constructed over drain board over waterproofing over structure. Shaw & Sons utilized its typical on-stucture form system that does not penetrate the waterproof membrane. Three proprietary procedures were used to prevent cracking and curling typical of on-structure construction.

It has been a pleasure working with everyone (from Shaw & Sons) . . . Both projects were a tremendous challenge for the whole team and I appreciate how everyone stepped up to that challenge and worked together to create a final product of which we can all be proud.

– Todd A. Calish, AIA, Principal, Calish Consulting Group